KOSUN's advice for drilling shale shaker maintenance

Drilling fluid shale shaker is a kind of filterable mechanical separation equipment, compared with other mechanical separation equipment, its unit cost is a kind of economy and high efficiency separation equipment which obtain solid removal amount. Drilling fluid shale shaker is made of screen body, machine rack and gearing, according mechanical vibration make solid phase which is big than screen hole and the adhesive attraction will screen the solid phase particles which is smaller than screen hole. But all mud can’t be processed in circulating process because of the limit of shale shaker mud permit.

Shale shaker maintenance:
1, When using the shale shaker,it is better to use the multiple shale shaker, so that not only can improve the bearing life, and other screens for extending the life of components is also very effective.
2, In the course, if we find there is the phenomenon of mud paste network, be sure to wash in a timely manner, to avoid long-term do not clean up, resulting in harm reduction shaker life.
3, During use, every 24 hours it need to add dropwise to the butter machine. Regularly check the screen box side bolts, if loose, timely tightening.
4, When stoping the shale shaker, you should rinse with water shale shaker screens and clean drilling fluids and sand embedded in the hole of screen with a hair brush.
5, The belt tensioning should be moderate, it's better to not to slip and does not produce severe beating. When shutdown, you should always check the tightness of the belt and timely adjustment.
6, The pulleys and vibration motor shaft are cast iron parts, which are connected by shaft sleeve and keys. When handling avoid banging, to prevent crushing. To this end, the sleeve has a top end surface of the wire 3-M12 and fastening bolts 3-M8, it's easy accessibility, easy replacement.
7. When lifting, non-foot and crushing screen during transport,it is prohibited save anything on it. The shale shaker screen box must be bolted with a fixed base four bolt of M20 × 110 before lifting and transport, to prevent shale shaker box excessive vibration and jumped off.
 
The shale shaker has stopped running when running in hole, and because drilling fluid is no longer circulating, the viscosity of up to more than 100μ, it's time to open the flapper of the shale shaker slots where drilling fluid through into screen,and close the flapper of the shale shaker where drilling fluid through, to prevent the drilling fluid of high viscosity flowing to the screen surface and paste mesh. If the flapper not closed tightly, there are drilling fluid into the screen, you should rinse shale shaker screens with water timely .

KOSUN can manufacture types of drilling fluid solids control systems according to the requirements of different drilling conditions. KOSUN is well-know as a professional manufacturer and supplier of oil drilling solids control equipment in China. After 20 years development,KOSUN is becoming more and more stronger,can provide more efficient equipments at the same time, the products including shale shaker, shale shaker screen, desander, desilter, vacuum degasser, centrifugal pump, submersible slurry pump, vertical centrifuge shear pump,mud agitator, mud gun, drilling fluid mud cleaner, decanter centrifuge, jet mud mixer, mud tank, diesel tank, water tank, complete solids control system,etc.