Sand making machine installation and employ of notices

sand making machine goes towards the heavy equipment, cellular phone and employ of require a certain rules and directions. It within the installation with even much more, here we take a look at its installation and employ have to give consideration as to the content:
One, sand making machine placed on a concrete foundation, the building blocks shall bear several occasions the load from the whole machine. Based on the different sand airport terminal could be arranged homework within the workshop or perhaps is set up in the outside work. When installed, ought to be the sand making machine progressing the spindle and also the vertical and horizontal. Sand making machine ought to be arranged over the lifting equipment, lifting equipment weight based on the sand making machine maximum weight into consideration, departing the lifting space ought to be over the sand making machine, sand making machine ought to be left along the side of the right space for recognition with.
Two, set up in the sand scene still should conduct an extensive inspection. Look into the lubricating oil pipe is connected firmly, trial operation before installation ought to be heavy having a oil, add Mobil vehicle lubricating super or 3# grease. Check if the lattice component lubricating oil pipe connected firmly, check carefully the impeller on whether there's an overseas body.
Three, look into the motor belt, would be to slowly move the motor, rotation to become in conjuction with the sand making machine label directions, when the other direction signs, should adjust the motor wiring, the rotation direction and signs consistent direction of rotation, is just prohibited. Dual motor drive, motor spindle set up as well as on each side, the wind not have the same quantity of triangular belt and spindle set up is connected, ought to be modified straight. Following the check and proper after reproduction, production prior to the first air load test machine, the exam machine to make certain you will find no mistakes before production.
Four, general crusher machine rotating empty load operation there was a time 4 hrs, load test encounter the grain size strictly based on various models, specifications, strictly more than a particular materials into feeding is uniform and continuous, the moisture content of not under ten to fifteenPercent (based on various materials), feeding arrived at PCL straight through impact sand making machine full load to date the burden trial running time 8 to 24 hrs
Five, sand making machine check vortex cavity observation door is closed, to avoid the fabric in the vortex cavity observation door out, danger. Look into the impeller and offerring equipment boot up sequence:
1, row material, sand making machine, feed
2, sand making machine begin to load, to sand making machine normal operation before feeding.
3, the shutdown sequence and boot on the other hand.