In life, there are a lot of people complain about their own home in the summer laying on the floor cracked very obvious gaps or laying on the floor from the dark of winter, and yet the problem is not the quality of the floor, do not know what causes it?composite wood deck
To solve the above problems, the flooring industry professionals explained: As the summer high temperature, when the pavement into the fall and winter seasons floor once, thermal expansion and contraction of the affected physical factors, likely to cause deformation, and even showed a more obvious cracks, floor coverings winter, summer will be presented to the expansion of the phenomenon from the drum. Therefore, experts recommend: Under normal circumstances, ideas for balcony flooring preparation user preferably in spring and autumn pavement floor.
Note: If you had to choose in the summer construction, we must avoid sun exposure floor was to ensure the room temperature below 30 ℃; winter construction temperature not less than 16 ℃, this temperature range is appropriate installation.
The weather is getting cold, dry air is also increasing. In this remind you to pay attention when installing floor flooring carefully read the manufacturer's installation instructions request.
Floor installation usually within the first ten days, watering is prohibited on the ground. After the cement mortar hit the ground level, ventilated case 30 days after the installation floor. In order to ensure compliance with the request to install the ground floor of the humidity, while the moisture content of the floor as the air in the fall and decrease the moisture content. Decrease in the moisture content of the floor in the process, the wood floors due to moisture loss and natural fibers shrink, so the physical phenomena of the floor swelling shrinkage is inevitable, the moisture content is too low will cause the floor cracks and other phenomena directly.
Note: The home humidifier available, fresh plant, slightly damp mop, etc. to the appropriate indoor humidification to reduce wastage floor moisture content.
Concrete paving method is: plastic lumber for sale thus extending from the door to the room began maximum span of 6 m floor × 8 meters, more than this limit, and must remain a contraction joint application buckle; the wall, the door layering interface reserved at the expansion joints must be greater than 8 mm; stitching at the request of continuous, uniform adhesive residue to timely liquidation; baseboard must reach 12 mm thick, otherwise it is difficult to conceal contraction joints; the thickness of the aluminum alloy layering should guarantee at least 2 mm , too thin, easily lead to warped deformed.
Also worth noting: the northern autumn weather more sand, dust floor special attention, usually with a poom or vacuum cleaner to remove dust, often stampede place to be diligent vacuuming. Pay particular attention to the foyer and hallway leading to the outside, in order to prevent dust entering the house, dust mats can be placed at the entry point.