Our Technology Co.,LTD, as the advanced Raymond mill mining machinery manufacturing enterprises in Henan Province, will contribute our share towards the creating of clean and civilized city for Zhengzhou city. In order to solve the building waste problem, the company invests heavy capital from the research and development of waste disposal equipment. In 2009, the mobile crushing station also named as building waste therapy equipment was published, which quickly entered towards the market and selled well in both domestic and overseas, subject towards the broad masses of customers.
There are two types of development waste disposal equipments: Raymond mill and track-type mobile crushing station. They can move without the influence of environment and sites, with Strong suitability and flexible configuration, reliable performance and easily repair. Henan mobile crushing station is successfully applied to the treatment of development waste in many big cities. It has made big efforts to create harmony and beautiful environment and home.
Based on the linked statistics, the quantity of development waste has accounted for 30%-40% from the total urban waste in China. Through the conventional of 500-600 tons per million square meters, our nation will add about thirty billion square meters of building waste by 2020, which can be a shocking figure. Connected reporter learned through the government that there will probably be no area to put the building waste with the urban growth and framework widening. The standard treatment will consume a substantial quantity land, garbage-collected fright. On the very same time the dust and gray during the removed and stacked procedure has also induced really serious environmental pollution. Consequently, the appropriate person says, the city has become constructed a development waste disposal web site within the southern suburbs in an effort to steadily resolve the building waste by unified collection and disposal.
After the assortment of waste, the three power control might be closed, then we will hold people accountable for cleaning to reduce the environment pollution" introduced from the related responsible person. This solid waste transfer station has become constructed and operated since last year, its services scope covered 10 square kilometers, east for the Plains Avenue, west to Hertiage Road, north to North Ring Road, south to Red Road. The main construction waste has muck, concrete, waste brick, abandon soil, disposable material, mud and other wastes. These can be used to produce the corresponding strength grade of concrete, mortar or the preparation of block, wallboard, floor tiles and other building materials after screening, can also be used for road pavement construction.