Empty load test run for Raymond mill

Equipment test run A: empty load test run for four hours B: load trial operation into the grain dimension strictly in accordance to various designs, specifications, no higher than a specified materials into; feeding and constant, water content shall not exceed 15% (in accordance to different material), feeding amount to achieve total load Raymond mill; load operation time of eight.

Fix and safety technologies: regular downtime open doors observation system sand machine internal dress in, center into feed tube, cone, impeller, movement channel lining put on plate, wear-resisting block, in the event you put on, timely replacement or repair, substitute wear-resisting block should be complete change, make sure wear-resisting block the identical excess weight.

Discover the impeller entire body put on must be replaced or repaired. Unique note: with out the workshop agreed, it is strictly prohibited to an impeller, mobile crusher is strictly prohibited to open the doors in the function procedure, as a way to steer clear of danger, otherwise, the consequences. Tools in the operation, due to its large running velocity, especially Caution! Production, related personnel must be far far from equipment. In the event the fix shall be carried out following the shutdown.