Sand making machine maintenance methods

sand making machine in the daily construction of such encounters, the head pulley and shaft parts of a gap caused by the hub axle head wear, eccentric shaft bearing position by the force caused by the phenomenon of wear, then the best and most efficient repair and maintenance program is the hub reaming, welding or machining repair after the main brush. But everyone knows both maintenance programs in the construction, thermal stress generated due to welding temperature can not be completely eliminated, could easily lead to material damage, resulting in part appears bent or broken; while electric brush by coating thickness restrictions, easy to peel, and more than two methods are used metal repair metal, can not change the relationship with the hard-on hard at the combined effects of various forces, will cause wear again, and both maintenance program at the time, stone crusher repair prices have been very high, but life is very short. Crusher equipment operating in the production of the construction process. During construction equipment major departure here for the various components are functioning properly, and other checks. Crusher equipment maintenance and operation of the process.

Where the basis of the previous two steps until the Sand making machine normal operation of equipment, can be put into the material, and to ensure that the material during the next feed into the crushing chamber evenly; during construction equipment bearing temperature should be noted that the bearing oil temperature at a controlled temperature below 70 ℃; stone crusher equipment downtime preceded stop feeding, etc. after the crushing chamber materials before emptying off the motor, where attention should be focused on the construction sequence, to refrain from careless, stuffed into irreversible situation. For crushing crushing equipment, its main use horizontal mode crushing way of crushing works, so if you need a variety of construction production in the ratio of aggregate size fractions, you must use multiple devices of different size fractions coarse, medium, fine grinding and other equipment to complete, not only complicate the process, but also to bring a lot of unnecessary expenses. The new cycle of cut stone-crusher then rub a crusher production patterns have changed, the bold use of vertical production design, manufacture, from the top of feeding, coarse, medium and fine grading freely cutting from top to bottom, or cut rub, materials changes in free fall with their own body, stone crusher equipment out of the spout can be adjusted according to production needs, so that the original manufacturing process becomes complicated simple, respect them. In addition, in crushing capacity design, with large crushing ratio of production, effectively implements a multi-purpose machine production function. Initial operation of the crusher equipment preparation stage. As we all know crusher equipment prior to construction, the primary problem is a stone crusher equipment for a full range of inspection, mainly for stone crusher equipment bearing lubrication, fasteners are tightened, guards are in good condition, from the top bolts are returned gaskets group is pressed, T-bolts are tightened. Also before running should be checked whether the inlet debris crusher equipment must ensure that the cavity operation. On the other hand, the basic technical training for staff induction is essential for staff training can not only save production time, while safety is an important part of enterprise development.

       In the industrial technology today, these problems will no longer have the maintenance of high prices, short life phenomenon. At present, the head portion of the shaft for the pulley and a gap caused by the wear of the shaft head and the hub, the eccentric shaft bearing position by the force caused by the phenomenon of wear, the use of a polymer composite material repair method, the repair process of the construction of the composite material with super strong adhesion, excellent compressive strength and other comprehensive performance, free removal, free machining site repair. Neither polymer materials repair welding heat stress, repair thickness is not limited, while products with metallic materials do not have to give way, can absorb the shock vibration equipment to avoid possible wear again, and greatly extend the stone crusher life of machine equipment parts for enterprises save a lot of down time, creating significant economic value. Starting crusher equipment put into operation, can generally be divided into the following four steps, mainly by: initial preparation stage stone crusher run, the run production in the construction process, the production process of conservation and operations and maintenance precise lubrication system . Below we according to the actual construction details for you to fully explain all the details of the above steps.