After the installation of the SICOMA Twin Shaft Compulsory Mixers Diesel portable concrete mixer, there is a breaking-in period, and how to guarantee the normal operation of the equipment and reduce the failure rate is a very important link during this period. Only correct use of the equipment can extend the service life of it and get the maximum return with the smallest investment to bring more profit for the enterprise to. So what matters should be noticed in the breaking-in period of the concrete mixing equipment?Henan Daswell Machinery is a professional manufacturer of construction machine for almost 30 years in China. We are dedicated to supplying our customers with best service and products, our major products include:DMP mixer planetary,SICOMA Twin Shaft Compulsory Concrete Cement Mixer,If you are interested in our products, please contact us freely: sales@daswell.com SICOMA Twin-shaft Concrete Mixer" width="300" height="300" style="margin-bottom: 10px; border-top: 0px; border-right: 0px; vertical-align: middle; border-bottom: 0px; padding-bottom: 0px; padding-top: 0px; padding-left: 0px; margin-left: auto; border-left: 0px; display: block; padding-right: 0px; margin-right: auto" src="http://www.concrete-mixer-for-sale.com/wp-content/uploads/2015/09/00-300x300.jpg" /> 1 First, the SICOMA concrete twin shaft mixer can not work overload, and we should deploy a suitable amount of work to prevent the overheating caused by long time continuous operations; 2 Please look at the instrument data frequently, when it shows abnormal commercial concrete batching plant mobile block making machine, should be stopped promptly to repair; 3 Strengthen the lubrication of the lubrication points, each operation class should lubricate the lubrication point in the breaking-in period;