In the installation process of the vertical roller mill, the user must pay attention to the correctness of its installation process, because good installation can make the machine better work, to the user to bring a greater amount of production, to ensure the production schedule.
The vertical roller mill to meet the era of rapid development, promote the development of the whole craft brought the milling industry. It is mainly used for processing and grinding of various ore materials, mainly including kaolin, mica stone, limestone, calcite, kaolin and other mineral materials.
Before the use of vertical grinding, all of the work must be carried out. Debugging work after installation. Debugging work can not be ignored, because a reasonable adjustment will make the work smoothly, to bring the work to ensure, so users must pay attention to the debugging of the milling equipment. Only in this way can we better to operate the machine, let him for us to create greater value. After the staff of the commissioning, it can know whether the device can be used. Therefore, the installation of vertical mill equipment debugging work is essential. Debugging needs a process, in order to achieve the material required by the fineness, one is the production of the unit time output.
The finished material fineness of grinding machine is mainly rely on the analysis machine to determine, and then the rotor speed and the speed of the fan with the completion of. Relatively speaking, the mill production is mainly the rotor speed, fan speed and feeding quantity to decide. General in the process of debugging, in determining the fineness of the machine is analyzed, and then gradually improve the fan speed, grinding materials will be with the updraft, quickly arrived at the upper part of the mill of machine parts, so that qualified powder will timely were isolated. This is the process of debugging.
In order to make debugging more smoothly, users in the milling machine is debugged, should pay attention to the fan speed and speed of mill and then reached the intended effect of the production. In production, the speed of the wind turbine is not too large, appropriate. , fan can very good complete the debugging work, for some special cases, vertical mill also spatial processing, to produce a guarantee, this is one of his strengths, to ensure that the user's production.