quarry crusher daily operation and maintenance

In the development of mining machinery industry, the rapid development of quarry crusher machine industry has become the industry. In the course of its use, to pay attention to the maintenance work, because in the work, his wear is very serious, need maintenance to maintain performance.

For crusher equipment, we in the operation to pay attention to the very, because it is not the general mechanical equipment, as a large crusher equipment, its operation must concern, so we in the operation, should pay attention to broken machine order and rules, making the work more smoothly.

In order to ensure the safety of staff, before production, the staff to wear work clothes, wear safety helmet, gloves, masks and other protective equipment; also check whether the loosening of the screw, electrical equipment around whether there are obstacles, crushing cavity ore or debris, belt tension degree of correction, all spring screws to fastening. And also check row ore mouth gap is in compliance with requirements and check whether the power supply is normal, the electrical protection system is intact.

In the operation process, the operation of  must not be taken lightly. Because of the crusher work when a dynamic process, therefore, need we always pay attention to. When the oil heating to 25 - 30 degrees, we can start the oil pump motor 5 - 10 minutes and check lubrication system and hydraulic in 0.11-0.18Mp observed return pipe return to normal oil oil conforms to the requirements of the rear main motor can be started. Also checked hourly lubrication station supply and return oil pipe temperature does not exceed 50 degrees, back oil in sufficient quantity, oil tank oil surface normal height.

In the crusher equipment empty load operation 1-2 minutes, to open the belt, began to mine.Can be packed to the mine, pay attention to mine is normal, especially containing mud, high moisture content of ore to prevent ore blockage to the mine mouth. Also notice the ore chute,crushing chamber, discharging funnel is blocked. To prevent non broken material into the crushing chamber. If the metal into the crusher, must stop immediately. In order to ensure the lubrication condition, the user must in the process of running, always check the thin oil lubrication system, keep the oil in the tank surface height, hydraulic output does not end in rated oil pressure (0.8Kg/c square meters) to oil temperature not higher than 45 DEG C.

Only after a reasonable maintenance, crusher can be better for us to provide production, provide the impetus for the development of mine cause.