Working steps of mobile concrete mixer

JZM, ZJC and JZD series of mobile concrete mixer are produced by Zhengzhou Pioneer Machinery Company. Today we will tell you the workflow of mobile concrete mixer. The first step is to load small amount of sand and gravel through the loading shovel to the mixing drum. Injecting water into the tank of self loading concrete mixer, meanwhile, water should also be injected into the mixing barrel.Henan Daswell Machinery is a professional manufacturer of mining machine for almost 30 years in China. We are dedicated to supplying our customers with best service and products, our major products include:diesel concrete mixer for sale,concrete mixer machinery,SICOMA MPC planetary concrete mixer,If you are interested in our products, please contact us freely: sales@daswell.com   When the injection process is completed, you can start to add cement into the mixing bucket. This process can be realized through the following two ways: manually, through the cement bags or the silo. No matter use which way batching plant for sale, the loading shovel of the self loading of concrete mixer will help complete the feeding process. After we put all the cement we need into the stirring barrel Planetary Concrete Mixers for sale, we will put the sand and gravel into the stirring barrel. At the same time, we also added other raw materials required for the modulation of concrete. The self loading concrete mixer can run to the specified location, at the same time, the rotation of mixing drum will not stop so as to ensure the concrete will not be solidified. There are several internal spiral blades in mixing drum, which are used for concrete mixing. Thanks to the principle of operation with bidirectional rotation Continuous concrete batching plants, and this improves the comfort of use, at the same time, it also maximize saves the working time and raw materials.   After work, the cleaning of the mixer is an indispensable part of the equipment maintenance, and it is also the premise to ensure the normal operation of the equipment in the work in the future.