Interior decoration, flooring installation and supervision methods

Must be installed in order to begin construction of the floor so after the completion of other projects completed, otherwise the floor outside of the project construction may cause varying degrees of damage to the floor.
Ensure clean before installing floor space, abandoned piecemeal wood, metal parts must be cleaned, in addition to the circuit, plumbing and heating route try not to go to the floor below.
Installation before use moisture meter to check the moisture content of the ground, common ground requires less than 20%, geothermal ground requires less than 10%, if not up to standard, excessive moisture, the need for dehumidification, otherwise due to damp floor Puwan tilt .
Flooring installation considerations, an installed home improvement general grasp floor before installing the door, if for special reasons, then be sure to install the door, the height of the floor must be set aside in the amount of time the door (calculated as: floor thickness + 2.5 mm thickness + buckle mat thickness), even though it will inevitably lead to bias were set aside, so be sure to install the floor before installing the door.
2, baseboard installation should pay attention: the gap between the floor baseboard with not more than 1 mm, if too nails fixed, the proposed two nail within 40 cm width.
3, if the shop is warm, a few weeks in advance to be sure to warm the open window ventilation, lower floor temperature, because when installing floor sustained temperature exceeds 27 degrees, the floor material damage can not be estimated.
4. Before installing the floor ready to purchase furniture, necessary maintenance measures in advance to take the floor, be sure to buy the regular brand of floor maintenance agent, and must not freeloaders free to choose, during renovation or purchase recommendation not strange salesman ensure the quality of products. (Not immediately after the arrival Puwan floor, it is recommended 7 days stay, maintain good indoor ventilation period.)
5, summer temperatures often soar, we must regularly open air conditioning cooling ventilation system, floor cracks would otherwise overheating and swelling due to temperature cracking.
Flooring Installation Tips 1, must be a reasonable gap between plates, or because of climate change will lead to expansion of cracking phenomenon. 2. Make sure the cage plate and the stability of the wood. 3, patchwork floor finishing portion can be increased, the income side of the floor can be carried securely with glue.
Overseer essentials floor installed third quality, seven construction supervision if the owner personally, had a look at how to install the floor supervisor. General installation flooring has suspended keel type two, strengthen the board and solid wood flooring more with suspension. Note that in the process of paving plate mats can not overlap, if resulting in thick mats because of overlap, mats somewhere high, will lead to the floor after bagging Puwan. Mats seams with 6 cm wide sealing tape, floor mats four sides up a 3-5 lead centimeters, provided that no more than baseboard.
Flooring installation sequence is generally begin laying the upper left corner of the room, if they have walls, pipes, etc., must be left aside 8-12 cm seam. Floor paved walkways bit, bring cartons tiled corridor as much sand residue in the decoration, the main walking routes carrying paper skin protection against incoming sand worn wooden floor.
Check the baseboard installation: because the fixed time to nail the baseboard and not let workers put the hammer on the baseboard, after a nail into the baseboard to use a special machine to complete the top into the top hat, and a similar color to be painted on the surface of the nail ointment.
read more:

  • flooring material cheapest
  • Cost of manufactured decking
  • plastic wooden floor