The followings are eight matters needing attention in the foundation construction of small concrete mixing plant.Henan Daswell Machinery is a professional manufacturer of mining machine for almost 30 years in China. We are dedicated to supplying our customers with best service and products, our major products include:concrete batch plant,diesel engine concrete mixer,concrete mixer with pump,If you are interested in our products, please contact us freely: sales@daswell.com 1. The level of the foundation in the small concrete mixing plant must be detected by the leveling instrument and super leveling instrument. Our company takes no responsibility for the damage which is caused by the uneven foundation. 2. Embedded iron should be prepared according to drawing requirements of small concrete mixing plant and the size of embedded iron should not be changed at will. If the size of embedded iron must be changed portable cement mixer, the technical guidance personnel working in the construction sites must know about it clearly. 3. The size of the steel mesh and the steel anchor should not be smaller than the size in the drawing requirement. The width and depth of the foundation should also not be smaller than the drawing requirements. YHZS60 Concrete Mixing Plant 4. Users had better not change the drawing size. If it is necessary to make a change SICOMA Twin Shaft Compulsory Concrete Cement Mixer, inform the technical guidance personnel. 5. The size error between two construction sites should not be bigger than 50mm. Mark the center and the size range of the foundation with lime. 6. The concrete deposit must be done before digging the foundation. 7. When digging the foundation, put the steel and the peg into the center of foundation. The center line of the embedded iron on the same foundation must be in the same line and the deviation should not be bigger than 20mm. 8. Before finishing pouring the concrete, the embedded iron must be horizontal to the ground. There should not be torsional angle and off center phenomenon.