For the sealing property of JS series double shaft concrete mixer Planetary Concrete Mixer manufacturer, the other parts of water system such as pipeline mobile brick making machine, junction, and valve should not be leaking expect the water pump packing seal parts, the suction valve should be sealed closely and the mixer can still work
After the installation of the SICOMA Twin Shaft Compulsory Mixers Diesel portable concrete mixer, there is a breaking-in period, and how to guarantee the normal operation of the equipment and reduce the failure rate is a very important link during this period. Only correct use of the equipment can extend the service life of it and get the maximum return with the smallest investment to bring more profit for the enterprise to.
The key points of the routine maintenance of the SICOMA concrete twin shaft mixer are inspection, cleaning and lubrication, which requires that the operator should follow the safety operation specification strictly Mobile Concrete Brick Making Machine, and here are the contents of the routine maintenance:
Our company specializes in the production of JS series double shaft concrete mixer and many other construction machinery, various related techniques have been walking in the world forefront, and in domestic market Daswell has always been an industry leader.
Before the operation, the operators should start the mixer load operation. The mixing tube should be positive to reverse the material mixer. The reverse operation is for several minutes, and there should be no impact judder and abnormal noise.
The mixers can be divided into two categories:fixed mixer and mobile mixer by device type. The fixed mixer is installed in a prepared basis and it cannot be moved. Its volume, high production efficiency and light weight are its advantages. It is used for mixing plant or mixing station; mobile mixer itself with a convenient wheel, small size concrete mixer machine, light weight, and good mobility applies to temporary works of small and medium sized company .
In the normal production process of concrete batching plant, operators should regularly check the concrete solidification condition of mixing drum and mixing shaft; if it is necessary, timely eliminate it. Before cleaning the mixing drum manually, cut off the power supply and gas circuit, eliminate residual gas and lock the control room; in the process of cleaning mixing drum, it is prohibited to knock the mixing shaft, mixing arm and mixing blade violently.
1. Check whether there is scrape phenomenon with the rotation parts and mixing drum of double shaft concrete mixer double horizontal axles forced concrete mixer Ready-mixed concrete batching plants, and timely adjust it.
Please note that: if the operator needs to enter the mixing drum to clean the forced type concrete mixer, except for cutting off power supply and fuse portable cement mixer, it is necessary to lock the switch box well.
Cumulative weighing method used in concrete batching plant can achieve good results. This weighing system is a combined weighing machine, and it is composed of cement weighing scale and sand accumulation scale. The cement scale is set in the middle, and sand accumulation scale is set on both sides. In the level system of concrete batching plant, cement and stone have separate weighing system and separate discharging gate.