How to Add Concrete Pump Hydraulic Oil

Oil change period of concrete pump, which is changeable according to actual usage, such as operating environment, temperature ready-mixed Concrete Batching Plants, working hours, and mechanical condition, is one year or one and a half years under normal operation. Generally speaking, oil of concrete pump can be changed in line with scheduled maintenance. When the machine leaves factory or has been repaired thoroughly, its oil should be renewed at the first time of second-class maintenance; afterwards, hydraulic oil can be changed when third-class maintenance is carried out. If pumping volume reaches to 1500 cubic meters, oil should be changed completely and oil tank should be cleaned.Henan Daswell Machinery is a professional manufacturer of mining machine for almost 30 years in China. We are dedicated to supplying our customers with best service and products, our major products include:Mini concrete mixer,mini mix concrete batching plant,Cement Silo,If you are interested in our products, please contact us freely: sales@daswell.com   To get to know polluted and metamorphic grade of hydraulic oil, the operator needs to check it. Then oil that should have been transparent, primrose, muddy, and emulsifying needs to be exhausted. After eliminating polluted oil concrete batch plant sale, the system should be cleaned by kerosene firstly and operating oil or naphthenic oil with low viscosity subsequently if the outgoing oil is very dirty.   To prevent usage of different oils and mixed usage of two types of oils, brand and quality of new oil should be verified.